Violation

Arrange, in sequential order, the steps to follow to load the cement into the bands for cementation.

5.Band is inverted over the tooth by the orthodontist.

2.Buccal tubes or attachments are wiped with utility wax.

1.Preselected orthodontic bands are placed on masking tape.

3.Cement spatula is placed on the gingival margin of the band.

4.Cement is allowed to flow into the circumference of the band.

All steps are correct

Please describe the matter of abuse